Utility-Scale Solar Project Development Guide

utility-scale solar development

Wind and solar together supplied 17.2% of all U.S. electricity in 2024, and that figure rose to a record 17% from wind and solar alone in 2025 (reference 3). In 2024, combined utility-scale and small-scale solar accounted for approximately 6.9% of total U.S. electricity generation — up from 5.5% in 2023, a 27% increase year-over-year (reference 2) . A grid-scale solar development typically generates more than 5 megawatts (MW) of electricity, which can be sold to a single downstream user or placed onto the grid for wider use by numerous customers (reference 1). With the world struggling to reduce the spread of COVID-19, it’s fair to expect shipments from China and other parts of the world to be delayed.

utility-scale solar development

It is critical for landowners to understand that signing an option agreement typically means agreeing to all terms of the underlying lease contained within the option contract. No government entity is required to approve its terms. Any document requiring a signature should be reviewed by an attorney (reference 1). Landowners should treat any proposed contract as if it will be developed, but should not rely on solar payments in their financial planning until a project is confirmed (reference 1). Many properties will be optioned for solar development, but only a fraction of those projects will actually be built.

The land is surveyed to determine exact panel locations. In Pennsylvania, municipal and township officials are responsible for reviewing all applications to build grid-scale solar projects and for regulating where and how solar projects can be built. The local municipality, county, or the developer may offer a public meeting to discuss the plans.

utility-scale solar development

Policy & Incentive Landscape

A solar lease will include provisions for termination and restoration. Current estimates are that it costs approximately $1 million or more per MW to develop a grid-scale solar project (reference 1). Trenches are dug for wiring, and panel support posts are installed.

Our People

Then, it can take another six months to a year to satisfy all the state and local regulatory requirements before the project is ready to begin construction. For projects connecting at the distribution level (less than 69 kV), the timeline for getting the interconnection agreement from the utility and PJM can be shortened to about 12 months or so. However, most landowners aren’t particularly well-versed in the benefits that solar power projects can offer. There is less competition from other developers, and land is reasonably priced. Most people probably don’t think of Pennsylvania as a solar power hotbed, but in some ways that works to Glidepath Ventures’ advantage.

PJM's review process does not consider local land-use regulations that may affect the ability of a project to be permitted https://scivast.com/articles/analysis-energy-storage-systems/ and constructed — that responsibility rests with local municipalities (reference 1). This involves multiple stages of technical review. PJM administers the process for evaluating and approving requests by developers to interconnect new energy resources, including grid-scale solar, into the regional transmission system. The generic lease terms favor the solar developer, but with informed negotiation and legal counsel, landowners can improve the terms (reference 1).

  • Simple revenue models that apply one flat price to stored energy can overstate value.
  • Batteries add cells, power conversion equipment, controls, fire safety systems, and higher operating costs.
  • A solar farm’s revenue equals the energy it sells times the price it receives, minus losses from curtailment and downtime.
  • Environmental and cultural studies are conducted to protect natural resources and respect local history, while permitting ensures compliance with all federal, state, and local requirements.
  • Inverters may need replacement or major service during the plant’s life, so budget models usually include that cost.

Look for Partners with Solar Expertise and Local Experience

As of early 2026, Pennsylvania has approximately 3,086 MW of installed solar capacity, ranking 22nd nationally, with a projected 4,404 MW of additional capacity expected over the next five years (reference 7). Looking ahead, cumulative U.S. solar capacity is projected to more than triple — from 236 GW installed at year-end 2024 to over 739 GW by 2035 (reference 4). In 2025, the U.S. solar industry installed 43 GW of new capacity, marking the fifth consecutive year that solar was the top source of new power added to the grid (reference 4). The utility-scale segment alone installed a record 41.4 GW in 2024 (reference 5). Solar accounted for 66% of all new electricity-generating capacity added to the U.S. grid in 2024 (reference 4).

What Is Included in Solar Farm Construction Cost?

A solar lease is a legal obligation that may last 25–40 years and can deeply affect how the land can be used (reference 1). Yet is close to major population centers. The solar irradiance levels found at Pennsylvania's latitudes are sufficient to make projects economically feasible (reference 1). Agricultural https://neuralooms.com/articles/climate-change-current-status-future-prospects/ and open land continues to be preferred because it is most suitable for new land use transitions (reference 1). Solar developers seek sites that minimize development costs and maximize return on investment.

utility-scale solar development

After the option is signed and the developer has confirmed substation capacity availability, the municipality or township typically receives its first look at the proposed project. As projects are withdrawn from the PJM queue, new projects are added (reference 1). Developers move forward only with projects that promise the greatest return on investment and can clear technical and regulatory hurdles. Most projects submitted to PJM will not be built.